SMA · Sunny Boy Solar Inverter
The necessary feed-in conditions for the utility grid have not yet been fulfilled, preventing the inverter from starting operation. This is often related to environmental conditions or initial setup parameters.
Click steps to track your progress.
Ensure that the PV array is not covered by snow or otherwise shaded.
Wait for higher solar irradiation levels.
If this message is displayed frequently in the morning, increase the voltage limit for starting grid feed-in by changing the parameter `Critical voltage to start feed-in`.
If this message is displayed frequently with medium irradiation, ensure that the PV array is correctly rated for the inverter.