Vacon · NXP AFE-II Drive
The drive failed to reach the required DC voltage within the set charging time for the Main Circuit Breaker (MCB). This can be due to a non-operational charging circuit, a high load on the DC link during charging, or an insufficient supply voltage for the charging circuit. This prevents the drive from starting up properly.
Click steps to track your progress.
Measure the input AC line voltage (e.g., between L1-L2, L2-L3, L3-L1) to confirm all phases are present and at nominal voltage.
Verify the resistance of the pre-charge resistors (if accessible) using an ohmmeter to ensure they are not open or shorted.
Measure the DC link voltage across the DC+ and DC- terminals after attempting to clear the fault, observing the charge rate.
Inspect the pre-charge contactors or solid-state devices for proper operation (e.g., coil voltage, contact continuity).
Increase parameter P5-06 (DC Link Charge Time) in small increments to allow more time for the DC link capacitors to charge.