EL
ErrorLib
Brands
||
  1. Home
  2. Wago
  3. PFC200 PLC
  4. 1 (Argument: 14)
About·Privacy·Terms

ErrorLib — Industrial Fault Code Library

Disclaimer: ErrorLib is an independent technical reference tool. While we aim for accuracy, always verify with the manufacturer’s official service manuals before performing maintenance on industrial equipment. ErrorLib is not affiliated with the brands listed.

1 (Argument: 14)

Max Gateway/Mailbox Modules Exceeded

Wago · PFC200 PLC

What does 1 (Argument: 14) mean?

The maximum number of gateway or mailbox modules allowed in the system has been exceeded. This configuration limitation prevents the system from functioning correctly, as it cannot properly manage or communicate with an excessive number of these specialized communication modules.

Common Causes

  • Too many gateway or mailbox modules physically connected to the controller.
  • System configuration attempting to utilize more gateway or mailbox modules than supported by the controller's hardware or firmware.
  • Incorrect module type identification, leading to miscounting.

Repair Steps & Checklist

Click steps to track your progress.

  1. 1

    Switch off the power to the controller.

  2. 2

    Reduce the number of gateway or mailbox modules connected.

  3. 3

    Switch the power back on to the controller.

Browse all codes in this manual (23)
Verified technical data. Last updated: April 2026

Related Faults

--Internal Data Bus Communication Error (Unidentified Module)0x00090003Modbus Slave TCP Start Failed0x00090006Modbus Slave UDP Start Failed
Source: Wago PFC200 PLC
Open Manual (Page 198)Search more codes in this manual