Traduciendo...
103
AC voltage too low
Fronius · Solar Energy
¿Qué significa 103 ?
The AC voltage from the public grid is detected as too low. The inverter temporarily disconnects from the grid and will resume feeding energy once grid conditions return to the permissible range.
Causas comunes
- Insufficient AC voltage from the public grid
- Poor grid connection quality
Pasos de reparación & Lista de verificación
Haga clic en los pasos para seguir su progreso.
- 1
Check all AC grid connections at the inverter and point of common coupling
Datos técnicos verificados. Última actualización: March 2026
Fallas relacionadas
Fuente: Fronius Solar Energy