Traduciendo...
10
Input line supervision
Vacon · NXP/C
¿Qué significa 10 ?
The input line phase supervision has detected that one or more input line phases are missing. Subcodes in T.14 can specify if the issue relates to diode supply (S1) or active front end (S2) phase supervision. This prevents proper charging of the DC bus and operation of the drive.
Causas comunes
- Input voltage consistently too low or too high.
- Failure in voltage monitoring circuitry (P1-01).
- Unbalanced three-phase input supply.
- Issues with input filters or rectifiers.
- Incorrect mains voltage setting (P1-03).
Pasos de reparación & Lista de verificación
Haga clic en los pasos para seguir su progreso.
- 1
Check the incoming AC supply voltage at the frequency converter's input terminals for all three phases.
- 2
Inspect all input fuses for continuity and ensure they are correctly rated and securely installed.
- 3
Verify the integrity and connections of the supply cables leading to the frequency converter's input terminals.
Datos técnicos verificados. Última actualización: March 2026
Fallas relacionadas
Fuente: Vacon NXP/C