E2-11
PLC Startup Type Scaling Failed
ABB · System
What does E2-11 mean?
The type scaling process failed during PLC startup. This is a critical error that prevents the PLC from correctly interpreting data types and ranges for I/O and internal variables. It can halt the startup process, lead to incorrect calculations, and compromise process control.
Additional Steps
Steps 1–2 are listed in Priority Fix.
- 3
Re-upload the PLC application and firmware, ensuring a clean and correct installation.
- 4
Consult the PLC programming manual for correct data type handling and scaling procedures.
Source: ABB System
View Official PDF