The supply unit (LSU) did not become ready (e.g., main contactor/breaker closing) within the expected timeframe. This indicates a problem with the LSU's pre-charging or readiness sequence. The drive cannot operate without a ready supply unit.
Click steps to track your progress.
Verify the incoming AC mains voltage at the LSU's input terminals (e.g., L1, L2, L3) using a multimeter. Ensure all three phases are present and within tolerance.
Check the operational status of the external main contactor or circuit breaker supplying the LSU. Verify its auxiliary contacts are wired correctly to the LSU's control inputs.
With power off, measure the resistance of the pre-charging resistors within the LSU (if accessible) to check for open circuits.
Monitor the DC link voltage (e.g., via diagnostic menu) during the power-up sequence to see if it begins to charge and where it stalls.
Verify the control power supply (e.g., 24VDC) for the LSU's control board at its dedicated input terminals (e.g., X1) using a multimeter.