Allen-Bradley · Logix 5000
A block-transfer request is currently in progress, and a response is required before another request can be initiated. This indicates an attempt to start a new transfer before the previous one completed.
Click steps to track your progress.
Inspect the Logix 5000 program logic associated with the block transfer instruction (e.g., MSG) to ensure proper sequencing and completion monitoring before re-enabling.
Monitor the status bits (e.g., .EN, .DN, .ER) of the block transfer instruction in Studio 5000 Logix Designer to observe its execution cycle and verify proper reset logic.
Verify the configuration of the block transfer instruction, including the communication path, data size, and target device address, for any discrepancies.
Check the operational status and responsiveness of the target device with which the Logix 5000 controller is attempting the block transfer.