Fanuc · AC Spindle Motor Alpha i-Beta i Series Parameters
The precharge circuit for the DC link in the converter failed to operate correctly. This can prevent the DC bus from charging to the proper voltage during startup.
Click steps to track your progress.
Measure DC link voltage during power-up to observe precharge behavior.
Test the precharge resistor for continuity and correct resistance value.
Verify the operation of the precharge relay or contactor.
Check control signals activating the precharge circuit.