Kone · Elevator Control
The platform is severely overloaded, exceeding its maximum rated capacity. This critical condition disables all motion functions to prevent damage or instability.
Click steps to track your progress.
Verify the actual load on the platform does not exceed the elevator's specified maximum rated capacity.
Inspect all load weighing sensors (e.g., load cells, pressure sensors) and their associated wiring for physical damage, proper mounting, and secure connections.
Check the input signal from the load weighing system at the Kone Elevator Control unit for plausible values when the platform is empty versus under a known test load.
Verify the 'Overload Threshold' or 'Maximum Rated Capacity' parameters configured in the Kone Elevator Control system match the elevator's nameplate specifications.