Lenze · 9300 Series
No PLC program has been loaded into the controller's memory. The controller is unable to execute any programmed logic or control functions without a loaded program.
Click steps to track your progress.
1. Connect the programming tool to the controller and perform a full "Download Project" or "Download PLC Program" operation, ensuring successful completion.
2. Verify the controller's memory status via the programming tool (e.g., "Memory Usage" or "Diagnostic Buffer") to confirm program presence and integrity.
3. Cycle power to the controller after a successful download to ensure the program is correctly loaded from non-volatile memory on startup.
4. Check controller parameters related to program execution (e.g., `P0-01` for operating mode) to ensure it's not set to "No Program" or "Configuration Only".
5. If memory corruption is suspected, try formatting the controller's non-volatile memory (if supported and all data backed up) and then re-download the program.