Mitsubishi Electric · FR-D700 Inverter
The anti-phase device has detected that two phases of the mains power need to be swapped, indicating a phase reversal. Alternatively, the L2 phase of the mains power (primary side of contactor) has been detected as open, leading to unbalanced power.
Click steps to track your progress.
Verify the phase sequence of the mains power supply using a phase rotation meter. If reversed, correct the L1, L2, L3 phase connections at the outdoor unit.
Measure the voltage across all phases (L1-L2, L2-L3, L3-L1) at the primary side of the contactor to check for an open L2 phase.
Inspect the contactor for proper operation, looking for signs of pitting or loose connections at the terminals.