Siemens · SINAMICS G120
The set time (p9661) for monitoring the forced checking procedure (test stop) for the 'STO via Power Module terminals' function has been exceeded. This indicates an overdue safety test that must be performed to maintain the integrity of the Safe Torque Off function.
Click steps to track your progress.
1. Initiate the STO test stop procedure as described in the safety manual, typically by deactivating and reactivating the STO inputs on the PM terminals (e.g., X124/X125).
2. Monitor the status bits (e.g., r9756) to confirm successful completion of the STO test stop.
3. Review parameter p9661 to ensure the test interval is appropriate for the application and maintenance schedule, adjusting it if necessary.
4. Verify the external safety circuit responsible for triggering the STO test stop is functioning correctly by checking its output signals to the PM.
5. Log the completion of the STO test stop in the maintenance records.