Communication error between Fronius Symo Hybrid and Fronius Solar Battery
Fronius · Solar Energy
¿Qué significa 979 ?
A communication error exists between the Fronius Symo Hybrid inverter and the Fronius Solar Battery. Battery operation is not possible, and grid feed-in resumes. This code is displayed if not in standby mode.
Causas comunes
- Loose or damaged communication wiring between the inverter and battery
- Faulty communication interface on either device
Pasos de reparación & Lista de verificación
Haga clic en los pasos para seguir su progreso.
- 1
If the system is not in standby mode, check the communication wiring between the Fronius Symo Hybrid inverter and the Fronius Solar Battery