0117

Shaft setup not done

Kone · V3F25/18 drive

What does 0117 mean?

The V3F25/18 drive will not run in normal drive mode; only RDF (machine room inspection drive in North America) and inspection drives are possible. This fault indicates that the initial shaft setup procedure has not been completed.

Common Causes

  • Shaft setup procedure has not been performed.

Repair Steps & Checklist

Click steps to track your progress.

  1. 1

    Perform the shaft setup procedure.

Browse all codes in this manual (20)
Verified technical data. Last updated: March 2026