ABB · ACS580
The drive's season configuration for scheduled operations contains an error where a season is set to start before a previous one. This logical inconsistency will prevent proper execution of time-based functions, potentially causing the system to operate outside of desired schedules.
Click steps to track your progress.
1. Access the drive's season configuration parameters, typically in parameter groups P96.xx (Time & Date) and P97.xx (Season settings).
2. Review the Start Date and End Date parameters for each configured season (e.g., P97.01-P97.04 for Season 1 Start/End, P97.05-P97.08 for Season 2 Start/End).
3. Correct any overlapping or inverted date ranges where a season's start date is prior to the end date of a preceding season, or a season's start is after its own end date.
4. Verify the current drive time and date (P96.03, P96.04) and ensure the time zone (P96.01) and daylight saving (P96.02) settings are accurate for the locale.
5. Re-apply the corrected season parameters and monitor the drive for recurrence of the warning.